Jul 11 2019

Case Study: Chemical Flushing - Removal of Wax Restriction


+ Flow Services


An O&G operator in the UKCS had a known wax build up in a production flowline. This restriction had the potential to progress into a full blockage without intervention but also incurred a loss of production until action was taken. Download the full case study to read more


Download Full Case Study

Download Full Case Study

Please login with your email address to access this file.

If you do not have already have an account, please fill in the registration form to create one.

You will be required to verify your email address to activate your account. Please check your spam mailbox if a verification email does not arrive imminently.

Quick Contact
Back to top