Paradigm

What problem are you facing?

Case Study: Paraffin Blockage Remediation in a 12-inch Oil Export Pipeline

A shallow-water Oil & Gas operator in Gulf of Mexico had a 12-inch oil sales pipeline that had become plugged due to heavy paraffin deposition. The blockage led to a significant proportion of the Operator’s daily production being shut-in and so a rapid remedial solution was required.

Contact Us

Do you wish to discuss a project, have a technical product application question or need to know more about a product or service?

Leave us your contact details and an expert from our team will be in touch with you shortly.

We're committed to helping you in any way we can. Leave us a note and we’ll connect with you shortly.

Scroll to Top