In one trip, reamer enlarges 933ft section from 6 ½” to 7 ¼"

Challenge

In a Rotary Steerable BHA, underream whilst drilling a 900ft section from 6 ½” to 7 ¼” under arduous drilling conditions, through a tightly interbedded limestone formation, with a continuous 900ft sequence of chert nodules.

A customer in the North Sea needed to underream a section greater than 900ft under challenging conditions. The application would require the reamer to be robust, activate after drilling the casing shoe track and then underream whilst drilling 70° hole, for at least 900ft. Obviously the tool needed to reliably deactivate once the operation was complete.

Solution

Run the Paradigm Extreamer™ with Premium PDC cutters.

Result

Using the Paradigm Extreamer™, a 933ft section was enlarged from 6 ½” to 7 ¼” over 36 hours of drilling and 78 circulating hours.

Post-operational analysis of the run indicated the reamer performed perfectly, meeting all the operational objectives of the application and the customer successfully ran the liner. Upon inspection, the Paradigm Extreamer™ with Premium PDC cutters was found to be fully functional.


Download complete Case Study here...

Download complete Case Study here...

Please login with your email address to access this file.

If you do not have already have an account, please fill in the registration form to create one.

You will be required to verify your email address to activate your account. Please check your spam mailbox if a verification email does not arrive imminently.

Quick Contact
Back to top

/case-studies/case-study-expandable-drilling-reamer-completes-north-sea-reaming-operation-after-78-circulating-hours